Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
The Aetherium Expanse Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Pallas Deep-Core Survey
(section)
Page
Discussion
English
Read
Edit
Edit source
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
Edit source
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
== Overview == Pallas occupied an unusual orbital inclination relative to most belt bodies, which made regular transit costly and contributed to its relative neglect as a survey target through much of the early Bootstrap period. By the mid-2080s CE, however, projections from the [[Vesta Foundry Platform]] and associated belt construction programs indicated that existing nickel-iron feedstock sources would face supply constraints within two decades if no new high-grade deposits were confirmed. Pallas, with its estimated bulk density and spectroscopic profile suggesting a differentiated interior, became a priority candidate. Funding for the survey was assembled across three years by a consortium of belt-affiliated industrial interests. The Luna Transit Authority β which had absorbed the former [[Shackleton Ice Mining Cooperative]]'s logistics network in 2091 CE β provided transport contracts and supply chain management, extending its operational reach from Luna's south pole into the inner belt. The [[Tycho Shipyards]] contributed two modified survey tenders adapted for extended low-gravity surface operations. The Luna Transit Authority also issued the necessary transit waivers for the mission's heavy equipment shipments, a process that delayed final departure by eleven months. The survey's scientific mandate covered four primary objectives: * Confirming or ruling out a continuous nickel-iron core intrusion in the upper 6 km of the subsurface * Mapping subsurface void structures and fissure networks * Characterizing volatile deposits in any identified sub-surface fracture zones * Assessing structural conditions for potential future extraction infrastructure
Summary:
Please note that all contributions to The Aetherium Expanse Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
The Aetherium Expanse Wiki:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Pallas Deep-Core Survey
(section)
Add topic