Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
The Aetherium Expanse Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Shackleton Ice Mining Cooperative
(section)
Page
Discussion
English
Read
Edit
Edit source
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
Edit source
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== Founding and early operations (2029β2033) === The cooperative was formally chartered in late 2029 CE by a group of thirty-one worker-members, most of whom had previously been employed on orbital habitat construction projects in cis-lunar space. Petra Vaszilieva, a former construction rigger who had spent four years assembling pressurized truss segments for early station nodes, drafted the founding charter during a six-week period of voluntary labor stoppage following a wage dispute with a now-dissolved contracting agency. The charter established that all operating decisions would rest with a rotating Board of Crew Delegates elected from active shift workers, that profits would be distributed as propellant-mass credits redeemable at recognized cis-lunar depots, and that no external investor could hold a controlling stake. Initial extraction operations were confined to a single claim at the eastern rim of Shackleton crater. Equipment in this period was improvised: repurposed drilling rigs originally rated for vacuum construction were modified with thermal shielding for work in permanently shadowed conditions, where temperatures remained below 40 Kelvin and standard lubricants failed within hours. Chief extraction engineer Domingo Reyes-Achebe solved the lubrication problem in 2031 by designing a pressurized bore-sled β an insulated, self-propelled drilling platform that maintained an internal thermal environment sufficient for mechanical operation regardless of ambient crater conditions. The bore-sled design, later adapted by several unaffiliated operations, became the cooperative's most significant technical legacy. By 2033 the cooperative had processed its first substantial propellant batch and delivered it to a cis-lunar resupply node, establishing commercial viability. Membership had grown to ninety-four registered workers.
Summary:
Please note that all contributions to The Aetherium Expanse Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
The Aetherium Expanse Wiki:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Shackleton Ice Mining Cooperative
(section)
Add topic